ISO14001 Certification

ISO14001

Environmental Protection Policy

  • We continue to induct saving energy and recycle
  • We continue to improve and follow environmental protection regulation and protect accidental happening
  • We continue to decrease usage of harmful material and deducted in pollution protection
  • We continue to decrease waste-handle manufacturing process and settle well down the storage and clearness.
  • We continue to introduce the environmental protection idea to employees, suppliers and outsourcing partner

Environmental Protection Idea

  • In response to EU RoHS, REACH decree, the supplier shall comply with birch for long lead-free, Stewed process and product related specifications and signed guarantee not to use banned substances.
  • In response to the United States in July 2010 President Obama signed the Act No. 4173 (HR 4173), "The Wall Street Reform and Consumer Protection Act" (Dodd-Frank Act), prohibits the use of long birch special statement "Conflict Minerals" (Conflict minerals ).

Conflict Minerals Declaration:

  • Not support from the use of armed conflicts, illegal mining and the poor working conditions in the mining of metal from the so-called "conflict minerals"
  • Require suppliers to fill the EICC-GeSI Conflict Minerals Report template, survey materials if they contain gold (Au), tantalum (Ta), tin (Sn), tungsten (W) and other metals, and confirm the ore source of these metals.
  • The supplier must fulfill corporate social responsibility, requiring supply chain commercially reasonable due diligence to ensure that the products provide long birch unused conflict the four metals.

Quality Control Circle

  • Sample standard adopted across MIL-STD-1916 sampling program to "0 received 1 rejected" as the criteria, emphasizing the presence of defective products is not allowed, as long as found in the sample of non-conforming product, precautions should be corrected
  • Quality acceptance criteria using IPC-A-610E-2010 (Acceptability of Electronic Assemblies) test specification
  • SPC (Statistic Process Control to trace each production status)
  • QCC (Quality Control Circle) to hold quality meting and study together for improvement corrective action
  • First Article confirmation to make sure production process correctly